State owned and local government

Preparing preliminary and final design of mechanical installation. odorising and secondary cells Križevci Žabno, Dugo Selo, Koprivnica I and II.

Preparation of the detailed design of mechanical installations and gas station LPG Kraljevica.

Partner for drafting main project for gas instalation in Street M.P. Miškine, Koprivnica.

Making of technological instructions for safe work on secondary reductive and odorising station Krizevci and Žabno.

Associate in developing the conceptual design of mechanical heating LPG liquid gas propane-butane Croatian home Voćin.

Associate in a preliminary replacement compressors, pumps, piping and shut-off installation of LPG (propane-butane) in PJ DC S. Brod.

Making of operational contingency plan to protect the environment for the operation of gas and gas fields liquid MOLVE, Đurđevac..

Preparation of software package for the calculation of the distribution of natural gas prices under the new tariff model of HERA.

Making of Projects for business justification for the sale of Croatian Forests Ltd.property (Cukur, Smuta, Herzegovac, Skočaj, Perčin and the Starča).

Supervision of construction works on the creek Vidovec, stabilization of the riverbed with quay with a length of 110 m.

Associate in making the Mechanical design for built intake manifold pressure of 75 bar, at Molve II

Supervision on the reconstruction of thermal stations transmitting direct type of connection in thermal stations indirect type of connection, the reconstruction in the domain of engineering work dismantling welding, assembly and test of thermal station HEP, Lastovska 9-17, during which enables safe filling with water, where the thermal stations by the end of the drive was in full readiness.

Supervision of the work on the setting up of a new sewer system, diameter 200 mm, length of about 100 m, at the residence of the Italian Embassy in Zagreb. Drafting the main project connecting wells OK-2 platform with PF-5 (engineering, construction, electrical, cathodic, protection, design process control, design protection) to underground gas storage Okoli PSP.

Supervision on construction of mechanical assembly work laying underground installations on the PSP Okoli and connecting wells in the length of 700 m OK with two production platforms PF-fifth

Drafting the main project connecting wells OK-2 platform with PF-5 (engineering, construction, electrical, cathodic, protection, design process control, design protection) to drive underground gas storage Okoli PSP.

Supervision of the work as a subcontractor, relocation and transfer due to the 10 (20) KV and LV cables at the intersection with the highway Zagreb - Sisak, Jakuševac - Velika Gorica (south) from km 6 +300 to km 8 + 400.

Supervision of the works of a partial reconstruction of the thermal station HEP Heating Zagreb - PHASE II in the boiler room of the Ministry of Maritime Affairs, Transport and Communications.

Associate in making capital mechanical, construction and project protection, installation of petroleum gas compressor skid units on oil - gas station Čepelovac - Hampovica to drive MOLVE.

Monitoring the work of the economic ditch cleaning in the field of water management Nova Gradiska total area of 100,000 square meters.

Associate in project design for relieving pressure 220 bar PSP (Underground storage) Okoli.

Monitoring the work of reconstruction Thermal stations Grga Novak for HEP Heating.

Supervision of construction and assembling works on laying underground installations middle pressure HDPE conduit 110 and 90 HDPE pipeline in the village of Peter (2200 m), for the Municipality of Ivanic Grad.

Supervision of construction and assembling works on laying underground installations supply HDPE conduit 110 and HDPE 63/110 Šumećani pipeline in the village (8000 m),for the Municipality of Ivanic Grad.

Supervision of construction and assembling works on laying underground installations HDPE conduit 63 110 and 63/110 HDPE pipeline Street Hearted (400 m), V Border exit (745 m), X Vinogradska exit (630 m), The Way to Paradise to bypass (600 m), Trdoščev hill (957 m), Poland street (200 m) Street Spirit (2000 m), the Municipality of Kloštar Ivanić.

Supervision of construction and assembling works on laying underground pipeline installation of HDPE 110 in Trojičkoj Street (1170 m), and Vinogradska Street (600 m) and Vinogradska Street II (1300 m), the Municipality of Kloštar Ivanić.

Supervision of construction and assembling works on laying underground installations HDPE 110/140 90 HDPE water supply and gas pipelines, Klostar Ivanic Bešlinac (3070 m), the Municipality of Kloštar Ivanić.

Supervision of the production and installation of prefabricated protective barrier (15 x 15 m) with the execution ground on two wells in the field owned underground gas storage Okoli.

Supervision of manual mowing plants, pipeline Pula - Karlovac DN 500 ANSI 600, width 10 m and length of about 170 km, for Plinacro Zagreb.

The supervision of the preparation and setting pole and hat for gas Transportation Corridor system in the length of the central Croatia, for Plinacro Zagreb.

Monitoring the work of the economic ditch cleaning machine in the field of water management Rugvica total length of 7,000 m, the Croatian Waters Zagreb.

Monitoring the performance of work traffic roundabout at the intersection of the bypass Klostar Ivanic "Županijske ceste" Zagreb County. Intervention in the area demanded rehabilitation and relocation of existing installations in the intersection, the main water supply, distribution pipelines, sewers, two oil pipelines, two slanovoda, telephone cables, two power cables underground, SPD 220 V.

Associate in project design connections for water and gas in the municipalities of Ivanic Grad, Križ and Kloštar Ivanić..

Monitoring the performance of the construction of the collector Ko-1 and Channel 1 for sewage settlement Lipovljani.

Monitoring the performance of work on the rehabilitation of street gas networks King Tomislav and its lateral streets Replacement of metal pipeline with HDPE pipe 110, as follows: Šarampovska street, Red statue, Joseph Kozarca street, street Slavko Kolar, branching streets of King Tomislav, Caginečka street in Kloštar Ivanic.

Monitoring the performance of construction work on the collector wastewater disposal diameter 400 mm, length 5000 m Upper beam - Lupoglav.

Monitoring the performance of the construction and commissioning of pumping stations for water in the street Borik Štakorovečkom Brdu.

Monitoring the performance of the repair of distributive supply pipeline Otpor - Caginec, Caginec - Graberje and water supply of Stac. 3 +600 +630 m to 4 m (betterment)

Supervision of construction works - lane to turn right at the intersection of State Road D30 and D31 in Velika Gorica.

Monitoring of the repair works of fuel oil tank 8000 m3, control the leak, repair of heating fuel oil to dry steam.